Local authorities · drinking water, wastewater
MunicipalitiesInter-municipal bodiesWater authoritiesPublic utilitiesPublic ports

The ladder you replace this year is the one someone will climb down for 20 years.

A reservoir ladder at the end of its life, a broken cast-iron hatch, rusting fall protection bars: we make what replaces them, in composite, which doesn’t rust. You price each structure in workwith., our pro portal, and we submit our invoices via Chorus Pro, the French public-sector invoicing platform.

idréva · Normandy-based manufacturer of composite access equipment, since 2015 · Rives-en-Seine

Request my local authority account

Free, no obligation. We approve your profile after a conversation, and an account manager is named for every project.

See the project steps
workwith. · your project in the workshop
workwith. “Your project in the workshop” screen: ready for dispatch on 14 October 2026, in 9 days; progress 19 of 20 tasks completed (sample data)
01 — Your situation

Equipment at the end of its life, on this year’s programme.

You are responsible for your local authority’s reservoirs, treatment plants and pumping stations. You keep them when contracts change. You replace their equipment as your programme goes on: the reservoir ladders this year, the pumping station hatches next year.

You choose the equipment and you request the quote. Then your elected official signs, and your finance department or your stores department places the order. The quote goes round your departments.

On the ladder, nobody will read the quote.

A technician will lift the cover, raise the bars, then climb down. What they will have under their feet and under their hands is decided on your quote.

A DROP OF SEVERAL METRES123
Cross-section of an equipped pumping station · schematic diagram
  1. The person going down, often alone
  2. 1The hatch opens with one hand
  3. 2The fall protection bars drop back down behind them
  4. 3The caged ladder does not rust
02 — Your structures

The structure stays damp, the equipment no longer rusts.

A reservoir or a pumping station never really dries out. On metal, corrosion always comes back in the end, and you have to replace it again. Composite doesn’t rust.

Composite caged ladder in a drinking water reservoir
Drinking water

Reservoirs, tanks, treatment plants

What we see
The original ladder is reaching the end of its life, in a damp tank, in contact with water intended for consumption.
What composite changes
Our drinking water ladders don’t rust, and their material is ACS-certified: the certificate ships with every ladder. For hatches, we offer a double nested cover with 2-point locking.
Composite ladder in a pumping station
Wastewater

Pumping stations, wastewater treatment plants, basins

What we see
The cast-iron hatch is heavy, or broken. The metal bars are eaten away, or there are none. And H₂S attacks metal.
What composite changes
The hatch opens with one hand, and the optional fall protection bars fit inside its frame. The ladder stays sound, with no repainting, and so does the guard-rail around the basins.
Composite fall protection bars tested at 1,200 J
Fall protection bars

Under the hatch, the bars.

Replacing the hatch is the right time to add what’s missing underneath. The fall protection bars are optional: they are ordered with the hatch, in the same estimate, and fit inside its frame. For our T1-Std hatches, they come in four sizes, from 600 × 600 to 1,500 × 800 mm. For a chamber or shaft in civil works, we make a module that is cut to fit on site. And at 1,200 J, the bag does not pass through.

Fall protection grids and bars
20 yearsService life
Once a yearA visual inspection

All that is left is to price them, then track each project through to the invoice.

The project steps
Request my local authority account

Free, no obligation. We approve your profile after a conversation, and an account manager is named for every project.

03 — Your project

A quote for every structure, an invoice via Chorus Pro.

In workwith., our pro portal, you price one structure, then the next. As the programme moves forward, the home screen shows where each project stands and what it needs from you. And each one has its own account manager.

workwith. home screen: “Hello Marie”, 2 files in the workshop, a current estimate for the Bellevue reservoir (sample data)
  1. workwith. screen: estimate so far, price hidden; your account manager prepares the final quote within 48 working hours (sample data)
    01

    Price at your rates

    You do the pricing yourself, at your rates. You configure your ladders to the height of the structure. For a hatch, you choose the size and, on the T1-Std 600, 800 and 1000, the position of the hold-open stay. Fall protection bars and guard-rails are added to the same estimate. Your account manager checks it, adapts it to the structure and sends you the quote. If you have a schedule of unit prices (BPU) with us, they use the prices and item numbers from your schedule on the quote.

    Quote within 48 working hours
  2. workwith. project screen: “Check the drawings, then approve them: the workshop is waiting for your go-ahead to start production”, with the Approve the drawings and Leave a comment buttons (sample data)
    02

    Approve

    Once the quote is signed on your side, you approve it in Messages or by email: we are the ones who turn it into an order. Standard or configured equipment goes into production with no drawings to approve. For a structure that needs a design study, our design office uploads the installation drawings to your portal, with their revision. You approve them, or you leave a comment: production waits for your go-ahead.

    In Messages or by email
  3. workwith. “Your project in the workshop” screen: the workshop workstations, Quality control completed, Packing in progress (sample data)
    03

    Track production

    The expected ready-for-dispatch date appears on your project as soon as it is set. During production, “Track production” shows you the progress at each workstation in our Rives-en-Seine workshop, with photos of the inspection and packing.

    Ready by
  4. workwith. menu: Overview, My estimates, My orders, My projects, My invoices, My documents; Catalogue, Library, Messages
    04

    Through to the invoice

    Quotes, drawings, order acknowledgements, delivery notes: your Documents file them by project. Data sheets, test reports and ACS certificates are on the same page. Your invoices are in My invoices. And we submit them via Chorus Pro.

    Invoices via Chorus Pro

workwith. screens, with sample data; prices hidden.

Your account manager replies within 48 working hours, in Messages. Supply and installation? We install too: they price the installation with you afterwards.

After installation, your idréva ladders need one visual inspection a year. check™ makes it visible on the ladder.See the annual inspection

Request my local authority account

Free, no obligation. We approve your profile after a conversation, and an account manager is named for every project.

04 — Who we are

Before you sign, documented proof.

We are idréva, a Normandy-based manufacturer of composite access equipment since 2015. A team that has been working with composite for more than twenty years, in our own factory in Rives-en-Seine since January 2025. You are choosing for other people: for the person who signs, and for the person who will climb down.

Our story
≈ 30Local authority customers, all over France
2015The start of the idréva story
24People in the team
2025Rives-en-Seine factory, in operation since 1 January
400+Active customers every year
Fall protection1,200 J

A 50 kg bag, dropped three times from 2.40 m.

50 kg× 32.40 mTHE BAG DOES NOT PASS THROUGH
Diagram of the test: a 50 kg bag, dropped three times from a height of 2.40 m onto a fall protection grid resting on its frame. The bag does not pass through.

This is the impact test from the INRS ED 6076 method, the INRS document on pumping stations. On our fall protection grids and bars, the bag does not pass through. A third-party inspection body has validated it.

The test report is in the Documents section of your portal.

Drinking waterACS

The material in contact with the water is certified.

On our drinking water ladders, the material has passed the ACS migration tests, in an approved independent laboratory. The certificate ships with every ladder, and you will find it in your Documents.

Workshop exitSignal™ “Approved” label, with the number, date and signature

Only green leaves the workshop.

Every piece of equipment is inspected in our Rives-en-Seine workshop. Equipment that ships carries the green “Approved” Signal™; on the label, its number, the inspection date and the inspector’s signature. The rest stays with us. This inspection is photographed: you can see it in “Track production”.

The Signal™ programme
Standards
  • Our ladders comply with EN ISO 14122-4 and NF E85-016
  • Our guard-rail is designed to NF E85-015 and EN ISO 14122
05 — Why we do all this

The person who will climb down that ladder may not be on your team yet.

We will probably never meet them. Yet it is for them that you are replacing it, and for them that we make it in composite.

06 — Request access

Three steps, one person who answers.

01You fill in the form

Your local authority’s name, its SIRET number, your contact details: a single form.

Now
02We check your profile

We approve your profile after a conversation, by phone or by email, then your login details arrive by email.

After a conversation with you
03Your account manager replies

You price at your rates; they check the estimate, adapt it to the structure and send you the quote.

Quote within 48 working hours
Your local authority account

No prices are shown to visitors: once signed in, you price at your rates.

Free, no obligation. We approve your profile after a conversation, and an account manager is named for every project.

Profile approved after a conversationNo obligationInvoices via Chorus ProData hosted in FranceMade in Normandy

Operator, distributor, installer or design office?Access requests are made in the same place

07 — Common questions

Replacing your ladders and hatches, in six questions.

Six short answers. For anything else, your account manager replies in the pro portal.

You create one estimate per delivery site, and each one becomes a quote. Your local authority’s sites are listed in Account and company: you prepare an estimate for each one, at your rates, with its preferred date. Your account manager checks each estimate and sends you the quote within 48 working hours. And each person in your local authority can have their own access, approved by your account manager.